Customer:

PPG DECO POLSKA Sp. z o.o., 8 Kwidzyńska str., 51-416 Wrocław

Contract for:

Modernisation of the PPG DECO Polska plant in Wrocław

Scope of external works:

  • construction of two foundation slabs for five silos:

       - a 16 m x 5 m foundation for three silos,

       - a 7.5 m x 4.5 m foundation for two silos,
         indirectly founded on CFA piles,

  • construction of 2 drip trays (unloading stations for tankers),
  • partial reconstruction of the road system,
  • reconstruction of the storm water drainage system,
    electrical system and external lighting,
  • construction of a mezzanine on the roof of the building
    to service the new technology.

Scope of internal works:

  • bricklaying works in technical rooms,
  • demolition works – floors, stairs, roofs, ceilings and flat roofs,
  • foundations for production equipment,
  •  steel structures for new technology
    (including external staircase),
  • accompanying works, i.e. sanitary and electrical installations
    (adaptation of building installations to the planned changes).

Completion time: 07.2025 – 06.2026

Location: Kwidzyńska str., Wrocław