Customer:
PPG DECO POLSKA Sp. z o.o., 8 Kwidzyńska str., 51-416 Wrocław
Contract for:
Modernisation of the PPG DECO Polska plant in Wrocław
Scope of external works:
- construction of two foundation slabs for five silos:
- a 16 m x 5 m foundation for three silos,
- a 7.5 m x 4.5 m foundation for two silos,
indirectly founded on CFA piles,
- construction of 2 drip trays (unloading stations for tankers),
- partial reconstruction of the road system,
- reconstruction of the storm water drainage system,
electrical system and external lighting, - construction of a mezzanine on the roof of the building
to service the new technology.
Scope of internal works:
- bricklaying works in technical rooms,
- demolition works – floors, stairs, roofs, ceilings and flat roofs,
- foundations for production equipment,
- steel structures for new technology
(including external staircase), - accompanying works, i.e. sanitary and electrical installations
(adaptation of building installations to the planned changes).
Completion time: 07.2025 – 06.2026
Location: Kwidzyńska str., Wrocław